fbpx

ATV 3
Loading Cargo Aboard ATV 3 – Edoardo Amaldi
Image Credit: ESA / CNES / Arianespace / Optique Video du CSG–S. Martin 2011

The European Space Agency’s Edoardo Amaldi mission to the International Space Station is scheduled for 1000 UTC on 9 March 2012. It is scheduled to dock with the ISS at 0138 UTC on 19 March, and stay attached until the end of August, when it will detach and de-orbit with tons of garbage and burn up in the atmosphere.

This is the third mission by ESA to the ISS and will carry almost six tons of cargo:

  • two tons of dry cargo
  • 285 kg of water
  • more than three tons of propellants

ATV 3
Assembled ATV 3 Spacecraft
Image Credit: ESA / CNES / Arianespace / Optique Video du CSG – J.M. Guillon

Pin It on Pinterest

Share This